Installation

Living wall installation in London and across the UK.

Installed by our own team, sequenced around your programme.

We install living walls weekly across Greater London and the M25, with projects in Bristol, the Home Counties and internationally. Directly employed teams fit the frame, the irrigation and the planting, working around scaffold, façade completion, M&E and handover, at one install day per 5 m² within the M25.

Delivering living walls in London for twenty years, first as Tree Box and now as Life on Walls

Louis VuittonNetflixSmegJ.CrewThe Red Carnation Hotel Collection

01 — What installation includes

One trade for frame, irrigation and planting.

We hold the whole package, so there is no gap between the frame installer, the irrigation fitter and the landscaper.

01

Directly employed install teams

The people on your scaffold are our own teams, working to our own details, not a subcontracted crew seeing the system for the first time.

02

Planting to full density

Planted on site as standard, pre-grown on request, at 36–42 plants per m² on Channel Pro® and 30–36 on Living Louvres®.

03

Irrigation commissioning and testing

Zones set by aspect, controller programmed, every dripper checked and the system left with a printed schedule.

04

Sequenced around site programme

We fit around façade completion, scaffold strike, M&E and handover dates, and we hold the slot once it is agreed.

05

Access, IPAF and RAMS handled

Access equipment specified and booked, RAMS issued before we arrive, IPAF-certified operators where a MEWP or mast climber is used.

06

Handover pack and training

As-installed drawings, irrigation schedule, plant schedule and a walk-through for whoever will look after the wall.

02 — How it works

Four stages on site.

01

Survey and access plan

We confirm the substrate, fixings, water and drainage, and agree how the wall will be reached, both now and for maintenance.

02

Frame and irrigation

Rails and system fixed back to the structure, supply line run and pressure tested before a plant goes near the wall.

03

Planting

Planted to full density and set out to the drawn palette, so the pattern reads as designed rather than as delivered.

04

Commissioning and handover

Irrigation programmed and run through a full cycle, wall cleaned down, handover pack issued and maintenance started.

03 — Key facts

Installation facts.

Install rates come from the estimate generator and are the figures we quote from.

Install rate
One day per 5 m² within the M25.
Domestic courtyard wall
Usually two to four days on site.
Commercial installation
One to three weeks, depending on access and sequencing.
Access methods
Step-up, ladder, tower, MEWP, mast climber or existing scaffold.
Coverage
London and the M25 weekly. Bristol, the Home Counties and internationally by programme.
Planting method
Planted on site as standard, pre-grown on request.
Response
We reply within one working day.

04 — Pricing

Price your wall before you call.

The estimate generator uses the same rates we quote from. Enter the wall dimensions and it returns a figure, with labour shown at one install day per 5 m² within the M25.

Channel Pro® system
£240 + VAT / m²
Living Louvres® system
£200 + VAT / m²
Installation labour
One day per 5 m² within the M25, quoted separately
Fixings
Wall fixings are not included

Rates are indicative and confirmed after a site inspection.

Living wall installed by Life on Walls on the arrival route at The Westin London City hotel
The Westin London City

Installed on a live hotel arrival route, working around guest access and a fixed reopening date.

05 — Relevant projects

Installed by our own teams.

“The living wall created by Life on Walls has become a defining feature of the hotel.”
Ufi Ibrahim
Chief Executive, Energy & Environment Alliance

06 — Straight answers

Installation questions.

How long does installation take?

We install at one day per 5 m² within the M25. A domestic courtyard wall is usually two to four days on site; a commercial installation runs one to three weeks depending on access and sequencing.

Do you need scaffolding?

Not always. We work from step-ups, ladders, towers, MEWPs, mast climbers or existing scaffold, and we choose the access method at survey so it can be priced and booked with the rest of the programme.

Does the wall look finished on day one?

Planted on site as standard, pre-grown on request. A pre-grown palette arrives at full density; a wall planted on site reads as a complete wall but fills in over the first season.

Which areas do you cover?

London and the M25 weekly, with projects delivered in Bristol, the Home Counties and internationally. System supply ships UK-wide.

Can you install to another designer's specification?

Yes. We install to issued drawings and specifications, and we will flag anything in the detail that will not survive the first winter before we start.

What happens after handover?

You get a handover pack, irrigation training and a maintenance proposal. Planned visits start in month one so the wall is looked after from the moment it is signed off.

07 — Elsewhere on the site

The rest of what we do.

Next step

Tell us about the wall.

Send a drawing, a photograph or a rough square metre figure with your programme dates and we will come back with a method, a sequence and a price.

Or call +44 1202 045490
2–4 Gatton Road, London SW17 0SQ

We reply within one working day.